Carpark leak remediation – Southbank
We successfully managed the remediation of a common podium courtyard as well as the nearby Planter Boxes causing water ingress into the below carpark basement. Our structured approach ensured proper diagnosis and long-term waterproofing solutions.
Our Services
- Leak Investigation: Identified the source of water ingress and developed a targeted remediation plan.
- Project Coordination: Managed planning, remedial engineering design, scope of works , contractor tendering, and compliance from start to finish
- Waterproofing & Repairs: Removed large trees from Planter Boxes and Removed old waterproofing, ensured proper falls were created, installed high-quality waterproofing to the podium and Planter Boxes, installed pod and pavers to podium area and reinstated Planter Boxes with soil for landscaping purposes.
- Final Inspection: Verified waterproofing effectiveness and completed defects checks.
Challenges & Solutions
- Uncovering Hidden Issues: Original waterproofing was bitumen and had to be grinded back, there was an issue with the glazing channel where the pool glazing windows are located and the common gym was still open during works.
- Minimizing Disruptions: Scheduled works efficiently to maintain residence access, introduced a hob to allow drainage and minimize risk for the glazing channel and introduced other modifications once further unknowns were discovered as efficiently as possible. Leak detection system was also installed to identify any compromises before pod/pavers and soil was installed.
- Ensuring Durability: Premium waterproofing solutions for long-term protection. Leak detection installed to easily detect any future compromises, which can be repaired straight away.
Outcome
The project was completed successfully, preventing further water damage and ensuring a durable, reliable waterproofing system.
NRS offer a range of Project Management services that help Owners Corporations complete their remediation projects successfully.

Heritage Façade Crack Repair – Southbank
We successfully managed the remediation of a large crack along the brick and concrete panel in Southbank. A full investigation was carried out to detect the fundamental issues causing the crack, which a remedial design and works was carried out and now complete.
Our Services
- Investigation: Identified the reasoning behind the crack occurring and developed a targeted remediation plan for a long-term repair.
- Project Coordination: Managed planning, remedial engineering design, scope of works , contractor tendering, and remediation works from start to finish
- Façade Crack Repair: Demolished a section of the column to investigate the structure to confirm how to remediate properly, used investigation to redesign scope and then demolish whole column. The column was then reinstated and concrete poured with the correct repair and remediation methods to ensure long-term benefits.
- Final Inspection: Verified quality of work and completed defects checks.
Challenges & Solutions
- Uncovering Hidden Issues: Unknowns of the structure of the column due to limitations in structural drawings and private access via Air BnB.
- Minimizing Disruptions: Scheduled works efficiently to maintain impacted residence access and negotiated funding agreements between builder and Air BnB owner to ensure there was no financial impacts during work.
- Ensuring Durability: Builders Warranty and Structural engineer sign offs
Outcome
The project was completed successfully, preventing further cracking and ensuring long-term value and safety to the building.
NRS offer a range of Project Management services that help Owners Corporations complete their remediation projects successfully.

Capping Replacement – Railway Place Fairfield
We successfully managed the remediation of a defected and non-compliant capping on the roof and level 3 & 4 of a residential building in Fairfield. Our structured approach ensured proper diagnosis and long-term waterproofing and capping solutions.
Our Services
- Leak Investigation: Identified the source of water ingress and developed a targeted remediation plan to rectifiy non-compliant capping.
- Project Coordination: Managed planning, remedial engineering design, scope of works , contractor tendering, and compliance from start to finish
- Capping Replacement: Used crane to store new capping on roof and balconies, removed old capping, installed weatherboards to create fall, installed new capping the correct and compliant way and ensured it was installed compliantly.
- Final Inspection: Verified capping effectiveness and completed defects checks.
Challenges & Solutions
- Uncovering Hidden Issues: Developers original builder’s poor workmanship and capping non-compliance causing water ingress issues.
- Minimizing Disruptions: Scheduled works efficiently to maintain impacted residence access.
- Ensuring Durability: Premium capping and detailed design to obtain plumbers certificate and warranty.
Outcome
The project was completed successfully, preventing further water damage and ensuring a durable, reliable capping system to work effectively.
NRS offer a range of Project Management services that help Owners Corporations complete their remediation projects successfully.

Leaking Tile Roof RemediationSouth Yarra
We expertly managed the investigation and remediation of a persistent terra cotta roof leak in an apartment building, ensuring long-term protection against water ingress.
Our Services
- Leak Investigation: Identified the root cause for an effective remediation plan.
- Project Management: Coordinated contractors, materials, and timelines.
- Tile Replacement: Installed high-quality terracotta tiles with new battens and sparking.
- Final Inspection: Conducted quality checks and delivered a completion report.
Challenges & Solutions
- Weather Constraints: Scheduled work strategically to prevent delays.
- Resident Impact: Minimised disruptions with efficient staging.
- Quality Assurance: Engaged expert roofers and premium materials for lasting results.
Outcome
The project successfully restored the roof’s integrity, providing residents with a durable, leak-free solution covered by extensive manufacturers and installer warranties
NRS offer a range of Project Management services that help Owners Corporations complete their remediation projects successfully.

Combustible Cladding Testing Gold Coast
We managed EPS cladding testing for a large Gold Coast townhouse estate, to identifying presence of combustible materials and helped the Owners Corporation secure significant insurance savings.
Our Services
- Cladding Assessment: Inspected and assessed for combustible materials. Extracted core samples.
- Project Co ordination: Ensured compliance with minimal disruption.
- Specialist Testing: Engaged accredited labs for combustible material analysis.
- Reporting & Compliance: Delivered detailed findings and recommendations.
- Stakeholder Support: Assisted in regulatory compliance aiding insurance negotiations.
Challenges & Solutions
- Ensured compliance with fire standards and Insurance Council of Australia
- Minimised disruption to residents.
- Helped reduce insurance costs.
Outcome
The project enhanced fire safety compliance and secured lower insurance premiums, benefiting residents with a safer, more protected asset.
NRS offer a range of Project Management services that help Owners Corporations complete their remediation projects successfully.

Combustible Cladding Replacement South Yarra
We successfully managed the rectification of non-compliant Aluminum Composite Panels (ACP) on a high-end residential apartment in South Yarra, ensuring council fire safety compliance.
Our Services
- Cladding Assessment: Assessed and confirmed the extent of non-compliant ACP.
- Project Coordination: Developed a structured remediation plan with minimal resident disruption.
- Regulatory Compliance: Worked with council, building surveyors, and fire engineers to meet all requirements.
- Tender Management: Competitively tendered the removal and replacement works to accredited contractors.
- Remediation & Supervision: Oversaw ACP removal and installation of fire-resistant cladding.
- Final Certification: Secured compliance approvals and closed out the Building Notice.
Challenges & Solutions
- Regulatory Compliance: Coordinated closely with authorities for a smooth approval process.
- Resident Impact: Staged works to maintain security and accessibility.
- Long-Term Safety: Installed premium fire-rated materials for future protection.
Outcome
The project was successfully completed, achieving full regulatory compliance and significantly improving fire safety for residents. The Owners Corporation now has a fully compliant building with enhanced long-term asset value and reduced fire risk exposure.
NRS. offer a range of Project Management services that will help Owners Corporations complete their remediation projects successfully.

Council Emergency Order - Fitzroy
We successfully managed the remediation of an unstable four level brick wall at A Fitzroy clinic, that was at risk of collapse, addressing a Council Emergency Order. Our team ensured structural stability, safety compliance, and minimal disruption to operations.
Our Services
- Assessment & Engineering: Used LiDAR and drone scanning for precise evaluation. Developed a structural rectification plan allowing occupants to remain inside.
- Project Coordination: Managed planning, structural engineering, scope of works , contractor tendering, and compliance with council regulations.
- Remediation & Reinforcement: Oversaw stabilization, reconstruction, and boundary coordination with neighbors.
- Final Certification: Secured Building permit approvals and ensured full compliance.
Challenges & Solutions
- Emergency Compliance: Acted swiftly to meet building surveyor and council safety requirements.
- Operational Continuity: Staged works to minimise clinic disruption.
Outcome
The project was completed successfully, ensuring compliance and long-term structural integrity.
NRS offer a range of Project Management services that help Owners Corporations complete their remediation projects successfully.

Leaking Podium Lygon St Brunswick
We successfully managed the remediation of a open podium couryard causing water ingress into the ground-floor lift lobby. Our structured approach ensured proper diagnosis and long-term waterproofing solutions.
Our Services
- Leak Investigation: Identified the source of water ingress and developed a targeted remediation plan.
- Project Coordination: Managed planning, remidial engineering design, scope of works , contractor tendering, and compliance from start to finish
- Waterproofing & Repairs: Damaged layers removed , repaired structural issues, installed high-quality waterproofing, and ensured proper drainage.
- Final Inspection: Verified waterproofing effectiveness and completed defects checks.
Challenges & Solutions
- Uncovering Hidden Issues: Developers original builders poor workmanship and defects causing underlying issues.
- Minimizing Disruptions: Scheduled works efficiently to maintain residence access.
- Ensuring Durability: Premium waterproofing solutions for long-term protection.
Outcome
The project was completed successfully, preventing further water damage and ensuring a durable, reliable waterproofing system.
NRS offer a range of Project Management services that help Owners Corporations complete their remediation projects successfully.
We partner with strata managers, commercial building owners and government agencies to identify, assess, cost and fix building defects and cladding issues.
Key Projects
With a head office in Melbourne and satellite offices in Brisbane and Sydney, we are equipped to support projects around Australia.
Completing a street front canopy combustible cladding replacement for high-rise mixed-use apartment building in the CBD.
This older-style apartment building in South Yarra had several major building defects such as roof leaks, structural cracking to the basement carpark, water leaks and cracking to brickwork façades.
Our team provided full project management services including intial engineering investigations, repair solutions, tendering and management of the remediation works.
A medium-rise complex in Fitzroy requiring brick remediation due to instability at high levels.
Our team provided full project management services including intial engineering investigations, repair solutions, tendering and management of the remediation works.
Combustible cladding was discovered in a low-rise apartment complex in Oakleigh. NRS was engaged to collect samples and provide a report for council.
A large commercial shopping centre found EPS cladding in the ineriors. Our team provided end-to-end support with engineering investigations and testing, repair solutions and removal.
A commercial car dealership in South Melbourne was found to have ACP cladding. We provided sample testing and a comprehensive report to the client.
This mid-rise apartment complex in Fairfield had a range of defects in the basement car park, including planter box leaks. Our team provided complete project management from first assessment to tendering and completing remediation works.
These mid-rise apartments in Brunswick East had a wide range of structural defects in the basement car park. Issues included cracking and water leaks.
NRS provided comprehensive support to assess, cost and repair the issues – including full project management of construction works.
Start your project with NRS
Need assistance with council building notices or insurance premiums that increased by multiples?
Whether you need an initial façade assessment, or have had a Fire Risk Assessment and Schedule of Works prepared by another provider, get in touch with National Remedial Services either online or by phone on 0430 370 773 for a ‘no-obligation’ quotation today.
Our dedicated team can help you with your combustible cladding issues at any stage of the process.